Project Name | Period | Customer | Site Location |
Replacement of Tube, ECO, GAH in furnace boiler | 2023.04 ~ 2023.09 | Daehan Paper | KOREA |
Installation of furnace wear zone | 2022.03 ~ 2022.04 | EQ squre | KOREA |
Design, manufacture and replacement of S/H #2 Tube in Gumi power plant | 2021.07 ~ 2022.08 | KEPCO KPS | KOREA |
Improvement of 1ST Bag Filter Damper | 2021.07 ~ 2021.07 | SME | KOREA |
Improvement of SPG Nozzle | 2021.03 ~ 2021.06 | Jeonju One Power | KOREA |
Improvement of FBHE’s flow | 2020.12 ~ 2020.12 | SME | KOREA |
Manufacture and replacement of condenser | 2020.07 ~ 2020.11 | Yeosu environment | KOREA |
Installation of air blower and duct | 2020.08 ~ 2020.09 | ESKON | KOREA |
Improvement of Back Pass Tube structure | 2019.07 ~ 2020.04 | SME / HKC | KOREA |
Improvement of ECO Bundle | 2019.05 ~ 2019.07 | SME / HKC | KOREA |
Replacement of fix plate and protector for tube | 2019.03 ~ 2019.04 | Samjoong E&C |
|
Improvement of LT S/H BUNDLE and Boiler performance | 2019.01 ~ 2019.03 | SME / HKC | KOREA |
Improvement of HT S/H BUNDLE | 2018.08 ~ 2018.09 | SME / HKC | KOREA |
Improvement of strainer in pipe line | 2019.04 ~ 2019.05 | Halla E&E | KOREA |
Improvement of blow down cooler | 2018.02 ~ 2018.03 | TSK water | KOREA |
Improvement of activated carbon atomizing pipe | 2017.04 ~ 2017.04 | GS construction | KOREA |
Expension work of plumbing | 2016.06 ~ 2016.07 | Dongseo food | KOREA |