Sort | Project Name | Period | Customer | Site Location |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at Nov.2023 | 2023.11 ~ 2023.11 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of FBHE EVA Tube in Donghae #1 | 2023.11 ~ 2024.01 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at Sep.2023 | 2023.09 ~ 2023.09 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Boiler Bed Nozzle and Water wall tube | 2023.09 ~ 2023.09 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at Aug.2023 | 2023.07 ~ 2023.08 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Repair of IP EVA tube's leak part | 2023.06 ~ 2023.06 | KOMIPO | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of SH in high pressure generation boiler | 2023.06 ~ 2023.12 | Seoul Energy | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at May.2023 | 2023.05 ~ 2023.05 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Bio#2 3rd Pass Water Wall | 2023.05 ~ 2023.07 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at Jun.2023 | 2023.06 ~ 2023.06 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of high pressure valve and pipe | 2023.05 ~ 2023.11 | Dongducheon Dream Power | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of water wall tube in cogeneration boiler | 2023.04 ~ 2023.10 | Seoul Energy | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of #1 Boiler SH Tube in Gumi power plant | 2023.03 ~ 2023.08 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Improvement work of furnace kick out corner tube in Donghae #2 | 2023.04 ~ 2023.07 | Soosan Industry | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at Fab.2023 | 2023.02 ~ 2023.03 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Backpass WTR Wall Tube in Donghae Biomass | 2023.03 ~ 2023.05 | Soosan Industry | KOREA |
Boiler Tube and Pressure part of Power plant | Annual unit price Contract for replacement of Boiler tube and etc | 2024.01 ~ 2025.12 | Poseung Green Power | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at Jan.2023 | 2023.01 ~ 2023.01 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Expansion and construction work of heat transportation pipe | 2023.02 ~ 2023.02 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Boiler #1 Tube in Yeosu Power Plant | 2022.11 ~ 2022.11 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of HP EVA TUBE in Inchon Power Plant | 2022.09 ~ 2022.11 | Kyeong dong | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of HIP TBN LEAD PIPE in Boryeong power plant #1 | 2022.09 ~ 2022.10 | KEPCO KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility | 2022.09 ~ 2022.10 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Furnace WTR Wall Tube in Donghae biomass | 2022.09 ~ 2022.11 | EWP | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Primary RH Tube in Yeosoo power plant #1 | 2022.07 ~ 2022.08 | KOEN | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of HRSG’s low pressure EVA. Tube | 2022.07 ~ 2022.11 | Hyundai heavy industires Power systems | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Bio#2 3rd Pass Water Wall | 2022.04 ~ 2022.07 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Over Haul work of pipe | 2022.06 ~ 2022.06 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of HRSG’s leaky part in Sejong power plant | 2022.05 ~ 2022.05 | KOMIPO | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility | 2022.05 ~ 2022.05 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Boryeong Thermal Power Plant #7 HIP TBN LEAD PIPE | 2022.04 ~ 2022.05 | KEPCO KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Sejong Combined Cycle Power Plant Units 1 and 2 Eva. Harp replacement work | 2022.05 ~ 2022.10 | HYUNDAI Power Systems | KOREA |
Boiler Tube and Pressure part of Power plant | Jeonjuwon Power Bio#2 WTR Wall replacement work | 2022.04 ~ 2022.08 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Boryeong Thermal Power Plant Main Steam Line Replacement Work | 2022.04 ~ 2022.06 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Dangjin Thermal Power #1 Boiler and GAH Maintenance and Replacement | 2022.02 ~ 2022.06 | KEWP/GUMHWA PSC | KOREA |
Boiler Tube and Pressure part of Power plant | Seokgmun Energy Boiler vulnerable part production and replacement work | 2022.02 ~ 2022.05 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Donghae Bio simple maintenance work (SH2 & Eva 1 & 2 & HSS) | 2022.02 ~ 2022.03 | Susan Industry | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance and Replacement of Boiler Tube in #4 | 2021.10 ~ 2022.05 | KEWP/Samsin | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Backpass in Donghae Bio Plant | 2021.08 ~ 2021.10 | Susan Industry | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Vortex Find and Boiler Tube | 2021.09 ~ 2021.09 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler Facilities in Daingjin thermal power plant #4 | 2021.08 ~ 2021.12 | Samsin | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of 1st superheater Tube in Wonju green power plant | 2021.07 ~ 2021.09 | KOMIPO | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Bio#1 S/H Tube | 2021.06 ~ 2021.06 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Superheater Tube in Gumi power plant #2 | 2021.06 ~ 2021.08 | KEPCO KPS | KOREA |
Boiler Tube and Pressure part of Power plant | New installation of assistance boiler Urea Spray Nozzle Opening | 2021.06 ~ 2021.06 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Embedded Tube Bundle in Iksan Sanggong energy | 2021.06 ~ 2021.06 | HKC | KOREA |
Boiler Tube and Pressure part of Power plant | New installation of Wing Wall Panel in Gunjang Energy #3 | 2021.05 ~ 2021.06 | HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of LT RH Pipe in Boryung thermal power plant | 2021.05 ~ 2021.06 | KEPCO KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Bio#2 1-R S/H Tube Bundle | 2021.05 ~ 2021.06 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Reheater Tube in Honam thermal power plant #2 | 2021.03 ~ 2021.03 | KEWP | KOREA |
Boiler Tube and Pressure part of Power plant | Emergency repair of Wall Tube in Bio#2 | 2021.03 ~ 2021.03 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Boiler Tube in Daingjin thermal power plant #2 | 2021.02 ~ 2021.04 | KEPCO KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Emergency repair of Wall Tube in Bio#2(3 times) | 2021.02 ~ 2021.03 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance of Boiler facility at FEB. | 2021.02 ~ 2021.02 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Emergency repair of FBHE S/H Tube | 2021.02 ~ 2021.02 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Repair of Embedded Tube Bundle | 2021.02 ~ 2021.05 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Water Wall Panel in Dangjin thermal power plant #3 | 2020.11 ~ 2021.03 | KEPCO KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance and Replacement of Boiler PSH Tube in #3 | 2020.11 ~ 2021.03 | KEWP/Samsin | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of S/H Tube Bundle in Topyung power plant | 2020.11 ~ 2020.11 | E-Well | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of FBHE Eva. Tube Bundle in SME | 2020.11 ~ 2020.12 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Emergency repair of Bio#1 SH Tube | 2020.11 ~ 2020.11 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Repair of FBHE Eva. Tube in SME | 2020.11 ~ 2020.11 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance and Replacement of Boiler PSH Tube in Dangjin thermal power plant #3 | 2020.10 ~ 2021.02 | KEWP / Samsin | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Combustor Rear Overlay Panel | 2020.10 ~ 2020.10 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Repair of Bio#2 Boiler Tube | 2020.08 ~ 2020.08 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement and etc of Combustor WTR Wall Panel | 2020.08 ~ 2020.08 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of FBHE S/H Tube | 2020.07 ~ 2020.07 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of #2 Bio EMBEDDED Tube Bundle | 2020.07 ~ 2020.07 | Jeonju One Power | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Boiler PentHouse Header Tube in Dangjin thermal power plant #9 | 2020.05 ~ 2020.06 | Gemhwa PSC | KOREA |
Boiler Tube and Pressure part of Power plant | Emergency replacement of PRH , Slope Tube in Taeahn thermal power plant #2 | 2020.04 ~ 2020.05 | KEPS Co.,Ltd | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of WTR Wall Panel in Dangjin thermal power plant #1 | 2020.03 ~ 2020.06 | Gemhwa PSC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement and etc of Combustor Wall Tube | 2020.02 ~ 2020.03 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Performance improvement of FBHE S/H , PA WIND BOX | 2020.02 ~ 2020.03 | SME | KOREA |
Boiler Tube and Pressure part of Power plant | Maintenance & Performance improvement of Boiler Back Pass Tube in SME | 2020.01 ~ 2020.03 | SME / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Boiler Tube in Donghae Bio Plant | 2020.01 ~ 2020.02 | Susan Industry | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of FBHE Tube in SME | 2020.01 ~ 2020.02 | SME / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Performance improvement of assistance pipe in Dangjin thermal power plant #2 (DR/DRE) | 2019.11 ~ 2019.12 | KEPCO KPS Co.,Ltd | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Tube Sampling in Donghae #2 | 2019.10 ~ 2019.10 | Susan Industry | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of WTR WALL PANEL in Dangjin thermal power plant #2 | 2019.09 ~ 2019.11 | KEPCO KPS Co.,Ltd | KOREA |
Boiler Tube and Pressure part of Power plant | Performance improvement of ECO BUNDLE in SME | 2019.05 ~ 2019.07 | SME / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of WTR WALL PANEL, RING Header in Dangjin thermal power plant | 2019.03 ~ 2019.06 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Performance improvement of SME | 2019.01 ~ 2019.03 | SME / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of WTR WALL TUBE in Donghae Bio plant | 2019.02 ~ 2019.03 | Susan Industry / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of S/H TUBE in Donghae Bio plant | 2018.09 ~ 2018.12 | Susan Industry / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of WTR WALL PANEL in Dangjin thermal power plant #3 | 2018.09 ~ 2018.12 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Performance improvement of HT S/H TUBE in SME | 2018.08 ~ 2018.09 | SME/HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of HRSG TUBE in Incheon thermal power plant | 2018.05 ~ 2018.06 | KOMIPO / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of 2RY S/H TUBE in Honam thermal power plant #1 | 2018.03 ~ 2018.04 | EWP | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of WTR WALL PANEL in Donghae Bio plant | 2018.03 ~ 2018.04 | Susan Industry / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of PSH & HANGER TUBE in Dangjin thermal power plant #2 | 2017.10 ~ 2017.11 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of R/H Outlet Tube in Honam thermal power plant #1 | 2017.10 ~ 2017.11 | EWP / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of HP/LP Header ,TUBE in SK thermal power plant #2,3,4 | 2017.09 ~ 2017.10 | SK/Eone | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of HP/LP Header in SK thermal power plant #1 | 2017.04 ~ 2017.05 | SK/Eone | KOREA |
Boiler Tube and Pressure part of Power plant | Manufacture and replacement of PSH,FSH TUBE in Boryung #1 | 2017.04 ~ 2017.06 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of Hanger Tube in Dangjin #1 | 2017.04 ~ 2017.04 | Gemhaw PSC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of BOILER COAL PIPING in Boryung #5 | 2015.10 ~ 2015.11 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | BOILER OVERHAUL In Donghae #1,2 | 2015.09 ~ 2015.12 | KPS / HKC | KOREA |
Boiler Tube and Pressure part of Power plant | Replacement of GS POWER #2 BOILER | 2015.06 ~ 2015.08 | KPS | KOREA |
Boiler Tube and Pressure part of Power plant | Manufacture and replacement of Banwol BOILE SIDE WALL PANEL | 2014.04 ~ 2014.06 | KPS / Saehan | KOREA |
Non-pressure part of Power plant | Replacement of HP Bypass Valve Diffuse, etc | 2023.10 ~ 2023.11 | Dongducheon Dream Power | KOREA |
Non-pressure part of Power plant | Repair of Circulation water facility in #3 | 2023.09 ~ 2023.11 | Samsin | KOREA |
Non-pressure part of Power plant | Replacement of Steam Line valve | 2023.09 ~ 2023.09 | SME | KOREA |
Non-pressure part of Power plant | Repair of No.6 Feed WTR Heater top PSV Leak | 2023.08 ~ 2023.08 | CGN Daesan | KOREA |
Non-pressure part of Power plant | Improvement of CWP A,B,C Pipe in Daesan Biomass power plant | 2023.08 ~ 2023.08 | CGN Daesan | KOREA |
Non-pressure part of Power plant | Repair of M/C assistant facility in #2CC | 2023.05 ~ 2023.06 | KPS | KOREA |
Non-pressure part of Power plant | Repair of water intake facility in #3 | 2023.05 ~ 2023.06 | Samsin | KOREA |
Non-pressure part of Power plant | Installation of GAH repair facility in #3 | 2023.04 ~ 2023.04 | KEWP | KOREA |
Non-pressure part of Power plant | Repair of pipe | 2023.04 ~ 2023.04 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Maintenance of Coal Burner in Dangjin power plant #7 | 2022.09 ~ 2022.10 | Iljin power | KOREA |
Non-pressure part of Power plant | Replacement of Boiler Bed Nozzle | 2022.06 ~ 2022.06 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Replacement of B-1, C-1 Journal in Dangjin Power plant | 2022.06 ~ 2022.06 | KEWP | KOREA |
Non-pressure part of Power plant | Maintenance of first Bag Filter Inlet Duct | 2022.04 ~ 2022.04 | SME | KOREA |
Non-pressure part of Power plant | Manufacture and Installation of Boiler CIDF’s manhole in Taean power plant #9 | 2022.03 ~ 2022.05 | KEPS | KOREA |
Non-pressure part of Power plant | Manintenance of Burner and Differential hydraulic cylinder in Taean power plant | 2022.03 ~ 2022.06 | KEPS | KOREA |
Non-pressure part of Power plant | Installation of Boiler facility’s amenities in Dangjin power plant #1~4 | 2021.09 ~ 2022.02 | The one industry | KOREA |
Non-pressure part of Power plant | Installation of Bio#2 S/H Protector | 2021.10 ~ 2021.10 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Overhaul work of Shceduled maintenance in Bio#1 low pressure Boiler Pipe at Sep. | 2021.09 ~ 2021.09 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Repair of S/H Protector in Bio #2 | 2021.07 ~ 2021.07 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Installation of Surplus steam and condensed water return pipe in Bio #1 | 2021.06 ~ 2021.06 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Replacement and Installation of Bed Nozzle, Pipe in Bio#1 | 2021.06 ~ 2021.06 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Installation of SPG Nozzle in Bio#1,2 | 2021.05 ~ 2021.06 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Installation of dust collector in Incheon thermal power plant | 2021.05 ~ 2021.06 | HKC | KOREA |
Non-pressure part of Power plant | Maintenance and replacement of Coal pulverizer accessory facilities in Taeahn #10 | 2021.03 ~ 2021.04 | KEPS | KOREA |
Non-pressure part of Power plant | Repair of Furnace Casing in Daehan Paper | 2021.03 ~ 2021.03 | R.E.C | KOREA |
Non-pressure part of Power plant | Installation of ammonia gas Purge Line in Dangjin | 2021.02 ~ 2021.02 | KPS | KOREA |
Non-pressure part of Power plant | Installation of Bicarbonate lagging in Poseung Biomass Cogeneration | 2021.01 ~ 2021.01 | Poseung Green Power | KOREA |
Non-pressure part of Power plant | Maintenance of Boiler inlet duct in dangjin #3 | 2020.10 ~ 2021.02 | KEWP/Samsin | KOREA |
Non-pressure part of Power plant | Maintenance of bottom ash treatment faicility in dangjin #3 | 2020.10 ~ 2021.02 | KEWP/Samsin | KOREA |
Non-pressure part of Power plant | Maintenance of organic solid fuel in Dangjin #3 | 2020.10 ~ 2021.02 | KEWP/Samsin | KOREA |
Non-pressure part of Power plant | Bio#2 OH Pipe | 2020.11 ~ 2020.11 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Repair of Expansion Joint | 2020.10 ~ 2020.10 | SME | KOREA |
Non-pressure part of Power plant | Replacement of Vortex Finder | 2020.10 ~ 2020.10 | SME | KOREA |
Non-pressure part of Power plant | Repair of HRSH Bellows in Daesan CZN | 2020.09 ~ 2020.10 | HKC | KOREA |
Non-pressure part of Power plant | Separation work of wastewater Pipe and repair of Bio#1 OH Pipe | 2020.09 ~ 2020.10 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Replacement of O/H Pipe in Bio#2 | 2020.09 ~ 2020.10 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Maintenance of Coal unloader CSU in Dangjin #2,4 | 2020.07 ~ 2020.09 | KEPID | KOREA |
Non-pressure part of Power plant | Replacement of #1 Bio O/H Pipe | 2020.08 ~ 2020.08 | Jeonju One Power | KOREA |
Non-pressure part of Power plant | Reinforcement of CV Casing in Taeahn #9 | 2020.07 ~ 2020.07 | KEPID | KOREA |
Non-pressure part of Power plant | Reinforcement of Eco. Casing | 2020.06 ~ 2020.06 | SME | KOREA |
Non-pressure part of Power plant | Repair of FSH Skin Casing in Taeahn #9 | 2020.04 ~ 2020.05 | KEPS | KOREA |
Non-pressure part of Power plant | Emergency Repair of FSH Skin Casing in Taeahn #10 | 2020.03 ~ 2020.03 | KEPS | KOREA |
Non-pressure part of Power plant | Performance improvement of Bicarbonate Supply facility | 2020.02 ~ 2020.03 | SME | KOREA |
Non-pressure part of Power plant | Replacement of Eco. Casing | 2020.01 ~ 2020.01 | SME / HKC | KOREA |
Non-pressure part of Power plant | Replacement of Eco. Casing | 2019.11 ~ 2019.11 | SME / HKC | KOREA |
Non-pressure part of Power plant | Repair of drooping Eco. Bundle | 2019.10 ~ 2019.10 | SME / HKC | KOREA |
Non-pressure part of Power plant | Bending work of Hanger Bundle Tube in Dangjin #4 | 2019.04 ~ 2019.05 | KPS | KOREA |
Non-pressure part of Power plant | Pipe welding and Aux v/v Seal Welding in Daingjin #4 | 2019.04 ~ 2019.05 | KPS | KOREA |
Non-pressure part of Power plant | Bending work of Hanger Bundle Tube in Dagjin thermal power plant #3 | 2018.09 ~ 2018.11 | KPS | KOREA |
Non-pressure part of Power plant | Replacement of Pipe Line in Samchuk themal power plant #2 | 2018.06 ~ 2018.09 | KOMIPE / HKC | KOREA |
Non-pressure part of Power plant | Manufacture and repair of Roof and Manhole in Taeahn #9 | 2017.10 ~ 2017.11 | KEPS | KOREA |
Non-pressure part of Power plant | Manufacture and replacement of Manhole in Taeahn #9 | 2017.10 ~ 2017.11 | KEPS | KOREA |
Non-pressure part of Power plant | Performance improvement of turbine’s assistance facility IA REGULATOR in Boryung thermal power plant | 2016.10 ~ 2016.11 | KPS | KOREA |
Non-pressure part of Power plant | Replacement of Pipe in Taeahn thermal power plant | 2016.07 ~ 2016.08 | KPS | KOREA |